General Dwelling Calculation Method (NEC ). By Warren Goodrich. General If 3 or less appliances, then enter at percent. If there are four, or more. Receptáculos y clavijas según NEC Today’s NEC® Page i TABLE OF CONTENTS SECTION DESCRIPTION PAGE Article Defines. NEC Article Definitions, defines Authority Having Jurisdiction as “The organization, office, or individual responsible for approving equipment, materials, .

Author: Kizilkree Vizshura
Country: Belarus
Language: English (Spanish)
Genre: Health and Food
Published (Last): 6 April 2014
Pages: 291
PDF File Size: 18.53 Mb
ePub File Size: 19.21 Mb
ISBN: 194-4-30836-785-6
Downloads: 9978
Price: Free* [*Free Regsitration Required]
Uploader: Dinris

Please keep in mind, that although you are working with a “temporary”, NEC Article must still apply as a permanent service, and be treated as such. The maximum allowable time for any type of temporary wiring are as follows; 90 DAYS on non construction type projects. Keep in mind that the chart in NEC Article If your service panel main over-current device size is 60 amps, you must use a feeder rated no less than a 60 amp rated conductor, from the transformer, through to the main lugs of the service panel, or the lug of your main over-current device depending on the mec2002 rated panel style that you plan to use.

You must use the 60 degree column found in NEC Table We must then make one more comparison to ensure our calculated neutral service rated conductor size in wire gauge is not smaller nc2002 the minimum grounding electrode conductor size as required in NEC Article Enter Your Zip Code: An example of an overhead meter base showing line [power into meter base] and load [power out of meter base to your panel] may be viewed by clicking on the picture icon to the left.

An example of another weatherproof 10 protected receptacle with a bubble necc2002 may be viewed by clicking on the picture icon to the left.

Suggested Wiring Procedures for an Overhead Temporary Service Pole (NEC ) – Self Help and More

Any form of receptacle exposed to the weather must be with a weather shield. Some Utility companies require you to furnish your meter base. The six maximum number of breakers may be either single pole or double pole breakers as long as it only takes six sweeps of the hand to just off all the main disconnect forms.

  AFI 51-201 PDF

Before we size our minimum neutral service conductor size we must compare that neutral service conductor size found in NEC Table See definitions in NEC Article Apply household cooking equipment total number of all cooking equipment to demand factor, in va.

D Please leave approximately 3′ sticking out beyond the weatherhead allowing enough conductor length that the Power Company may have enough to work with during their connection to your service entrance conductors.

The conduit size must be sized meeting the requirements of NEC Appendix C using the conduit type you plan to use compared to the conductor size and type of insulation on those conductors. Then refer to nec article If you use a type service panel with more than two [three or more] circuits in the box, you must use a minimum rating of 60 amps, weatherproof service rated panel.

This will be your starting point from here.

Some Utility companies will even furnish the entire temporary and electricity for one set fee. An example of a plastic bushing installed as required for 4 awg or larger conductors in a conduit may be viewed by clicking on the picture icon to the left.

If you are using aluminum wiring you must use anti-oxidation inhibitor [Nolox] at each connection of that aluminum conductor. You must show that the temporary wiring is under a controlled supervision.

If you use a type service panel limiting only one circuit in the box, you may use a minimum rating of 15 amps, weatherproof service rated panel. This document necc2002 based on the national electrical code and is designed to give you an option, as a self – help, that should pass minimum code requirements.

If your service panel main over-current device size is amps in a residential setting, you must use a feeder rated no less than a amp rated conductor, from the transformer, through to the main lugs of the service panel, or the lug of your main over-current device depending on the service rated panel style that you plan to use.

  IBN TEYMIYYE PDF

Please keep in mind, that if you use a single main overcurrent device smaller than the maximum rating of your service panel, you may reduce the feeder size to equal your main overcurrent device maximum rating, but you must provide ampacity of that service conductor equal to the maximum demand load to the equipment to be used.

You must use the 75 degree column found in NEC Table If you use a type service panel with only two circuits in the box, you must use a minimum rating of 30 amps, weatherproof service rated panel.

One last look at an overview example of an overhead temporary may be viewed by clicking on the picture icon to the left.

Suggested Wiring Procedures for an Overhead Temporary Service Pole (NEC 2002)

Check the support requirements of the style and type of conduits you are using. You must not use an aluminum grounding electrode in direct contact with the earth. The following feeders are accepted practice to use in this application to serve as a service entrance conductor serving an overhead temporary, but this list does not name all conductors approved for this application.

Any receptacle must be GFCI protected if on a temporary service pole or if volt rated receptacle or receptacles rated more than 30 amp must be recorded on nce2002 records made available to the electrical inspector upon request. We must size our grounding electrode conductor by NEC Table Some Utility companies will furnish that meter base for your temporary.

This nec0202 might be clear or opaque. If installing a grounding electrode conductor to a made electrode the maximum grounding electrode conductor size required is a 6 awg copper conductor NEC Article Accepted practice will lead you to Sch 40 PVC due to a cost factor.