ALCATEL BTS INSTALLATION AND COMMISSIONING PDF

BTS ON-Line commissioning Procedure using B10 Go to configuration>> Hardware setting>>Begin HW modification. Edit Sector Mapping and. Alcatel Bts Installation And Commissioning Pdf. BTS OFF-Line commissioning. Procedure OF ALCATEL BTS using B Prepared By: Umair. Installation & Commissioning – BTS, Microwave I&C of all Types of BTS-2G ( NSN, Ericsson, Huawei, ZTE, Alcatel-Lucent etc) in all possible installation types .

Author: Mezahn Zulkizuru
Country: Philippines
Language: English (Spanish)
Genre: Environment
Published (Last): 26 January 2014
Pages: 217
PDF File Size: 7.92 Mb
ePub File Size: 3.87 Mb
ISBN: 197-5-26618-439-3
Downloads: 74325
Price: Free* [*Free Regsitration Required]
Uploader: Durg

Activation is finished when the options in the commissioning menu become active. Assumed Knowledge You must have a instalpation understanding of the following: Te clamp bridge 3 in AC-outis present.

BTS commissioning Alcatel A9100, n some troubleshooting

The email address entered is already associated to an account. Choose the alarm Enter the new value. Add Your Answer Tips for a great answer: The CCL has to be completed as each instruction is carried out. AC Filter Connection Box 3.

Set the Qmux Address 1. Click [ Transmit ] 5. Checking the RF cabling Option: For 3-phase system check: All voltage checks are carried out on site side of the breaker.

  DORISMAR EN REVISTA H EXTREMO PDF

Click the “Commissioning Report” window to make it active. The BTS is powered down. Inhibit Power Down Timer. The clamp bridge 3 in AC-out is instxllation present. Close the BTS power panel 7. Check the service lights are OK 3. I have freestanding Series 8 dishwasher. Connect loads if antennas are not available.

Click [ Upload ] 4. Best thing about this new service is that you are never placed on hold and get to talk to real repairmen in the US. If the setting is not correct, set the number of battery units: Wait for the VSWR measurement received message in the status window 3. Bridge removal for 3 phase AC power 4. Just got an Amazon Echo Dot 3 and every time I ask alcatfl to set a reminder, it says,”Reminders are not currently supported on this device. Identify those ports Measurement for Tx 2.

BTS SW download in progress Click [ Confirm thresholds ] to update the RI. Close the door of the rack.

Access Technologies & Services LLC Qatar | Engineering Services Projects

Click [ Sector mapping ]. Close the AC connection box. Click the [ RA ] and [ RB ] buttons, if they appear black they appear greyed out if the previous value measured was the same one 4. Test the GPS 1. Checking and Setting the Alarm Mapping Table 6.

  BORZOI COLLEGE READER 7TH EDITION PDF

BTS Installation and Commissioning

The max point reward for answering a question is When finished, click [ Manufacturing part ] 8. If the Measured Value is 1.

For commissioning phase it is necessary to have 4 satellites available for synchronization. The check is made before the breakers, where the power cable is connected. David Payne Level 3 Expert Answers.

Use the table below to choose the right case for powering up the BTS. Audience This document is intended for: See Figure 44 and use DES 2. Site administrators Project alcaatel Field service technician Supervisors Occasional users e.

This article was written by admin