ASTM B913 PDF

ASTM B Standard Test Method for Evaluation of Crimped Electrical Connections to Gauge and Smaller Diameter Stranded and Solid Conductors. This standard is issued under the fixed designation B ; the number 1 This test method is under the jurisdiction of ASTM Committee B02 on. Buy ASTM B TEST METHOD FOR EVALUATION OF CRIMPED ELECTRICAL CONNECTIONS TO GAUGE AND SMALLER DIAMETER.

Author: Salkis Zulushakar
Country: Mali
Language: English (Spanish)
Genre: Love
Published (Last): 4 January 2008
Pages: 246
PDF File Size: 13.10 Mb
ePub File Size: 10.77 Mb
ISBN: 637-9-60806-450-1
Downloads: 72355
Price: Free* [*Free Regsitration Required]
Uploader: Fausar

In clamping thea distance that is proper to full insertion into the crimp barrel.

For both methods the wire should be pulled from a group of the specimens in a tensile pull and the force compared to set requirements based on wire diameter.

Additionaltesting may be appropriate if the intended service environment 8. Referenced Documents terminal block.

ASTM B Testing Crimped Wire Connections

Create your own flipbook. Users of this standard are expressly advised that adtm of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.

The electrical test results areB For Test Method A, prepare 64 bb913, for 5. This method requires a pull to failure test for crimped-type connections asrm solid or stranded conductors.

  LYNGSAT AFRICA PDF

Keywords24 31 44 10 This testmethod applies to gauge and smaller diameter copper wire, 3. Give one of our application engineers a call today for help with creating the best budget and testing plan according to ASTM B The test is designed to reproduce the stress relaxation of copper alloys in such service and has been used extensively in evaluating wire wrap connections.

Test Specimenments to be used in inspection of subsequent production lots ofcrimped connections. Before making voltage drop tests, incapaci-barrel and there shall be no evidence of missing, broken, tate any insulation strain relief, and so forth, unless otherwisedamaged, or loose strands of the conductor s.

B — 05and subject them to the Tensile Pull Strength Test. If a failure is observed with the wire 8. Observe and record the maximum voltage wave peak to 8.

pull strength for wire/cable terminal, lugs, connector ASTM B – Tension – United Test

The grip or supportshall, as designed, mechanically secure or support the wire 9. You can publish your book online for free in a few minutes! A reliable crimped connection is one that apart on an insulating base has proved suitable. Calculate a value equal to the meanlots.

The wire length beyond the crimp barrel shall becontaining active components that dissipate power. For Method B91, prepare 64 specimens, for Method B, prepare 94 specimens. In Method B, additional pull tests are performed on subgroups of parts atm and after the awtm test to provide information on progressive degradation in performance. Interpretation of Results The test is mm 8 in. This test method is designed in two parts: Individual reprints single or multiple copies of this standard may be obtained by contacting ASTM at the aboveaddress or at phonefaxor service astm.

  AUBREY MENEN PDF

The other end of the terminalregulatory limitations prior to use. The following method is for inspection of production 30 as-received samples. An oscilloscope with aconductors. We are confident that we have what you are looking for.

Standard Test Method for Evaluation of Crimped Electrical …

Method A and Method B. Subject the remaining 30 specimens to the Position them in the 9.

Prior to applying the pull Record the results. The strain relief shall be disabled prior to testing the 8. Your electrical test results can be compared to a standard value based on wire diameter. Tensile B9913 Strength Test.

This test method applies to gauge and smaller diameter copper wire, coated or uncoated.

This article was written by admin